Structured Cabling Systems (SCS) installed by previous integrators were audited and dismantled.
- systems were installed without damage to the finishing of the premises;
- Laying more than 2.7 kilometers of cable products KPVong-HFE-VP (200) 4*2*0.51 (F/UTP-cat.5E LSOH;
- laying more than 1 kilometer of power cables in a metal hose;
- 30 Schneider Electric computer sockets, 2*RJ45 installed;
- 25 Schneider Electric Asfora power outlets installed;
- 4 floor sockets installed for 8 Ultra modules, ETK44108;
- wiring closet installed;
- switching of information channels in the server room was made in the patch panel;
- switchboards with inlet connections for DGS, UPS installed;
- After the completion of the installation work, measuring measures were taken;
- Scheme-project of switchboards with automation has been handed over.
Result: the work was done professionally and efficiently, within the time allotted by the contract.