The structured cabling systems (SCS) installed by the previous owners were audited and dismantled.
- systems were installed without damage to the finishing of the premises;
- laying more than 1 km of cable products;
- Viewed by 24 Schneider information outlets;
- switching of information channels in the server room was made in the patch panel;
- Installed built-in Conference sockets in the conference table (220V/HDMI/RJ45);
- After the completion of the installation work, measuring measures were taken.
Result: the work was done professionally and efficiently, within the time allotted by the contract.



